| Compact, single-circuit unit | 20–100 kW (about 6–28 refrigeration tons) | One or more scroll compressors | Mild to warm conditions; select a high-ambient-rated configuration for sustained hot weather. | Often suited to small commercial buildings and process loads. Check minimum capacity, sound levels, and whether the unit has one or multiple refrigerant circuits. |
| Modular or multi-scroll unit | 60–300 kW (about 17–85 refrigeration tons) | Multiple staged scroll compressors | Suitable for a broad range of climates when selected for the local outdoor design temperature; low-ambient controls may be needed for winter operation. | Staging can match changing loads and provide partial capacity if a circuit is unavailable. Confirm module arrangement, water-flow requirements, and controls compatibility. |
| Medium-capacity screw unit | 150–700 kW (about 43–199 refrigeration tons) | Screw compressor, fixed-speed or capacity-controlled | Can serve warm and hot climates with appropriate high-ambient selection. Performance and available capacity vary with outdoor temperature. | Consider part-load performance, starting current, service access, and the unit’s published capacity at the project’s actual design conditions. |
| Variable-capacity screw unit | 200–1,000 kW (about 57–284 refrigeration tons) | Screw compressor with a variable-speed drive or other capacity-control system | Useful in climates with substantial load variation; confirm operating limits and capacity at both peak and cooler outdoor conditions. | May improve load matching when the system operates frequently at part load. Compare certified performance data, electrical requirements, and drive operating limits. |
| Large-frame air-cooled unit | 500–1,500 kW (about 142–427 refrigeration tons), depending on configuration | Typically multiple screw compressors; air-cooled centrifugal configurations are less common and availability varies | For hot or mixed climates, verify the selected unit’s maximum ambient operating temperature and capacity at the site design point. | Check footprint, airflow clearance, sound, electrical service, redundancy, and whether multiple smaller units would better meet the project’s reliability needs. |