| Alloy and application fit | Confirm the specified alloy and temper against the profile’s intended use, design loads, forming needs, and finish requirements. 6063 is widely used for architectural extrusions; 6061 is commonly selected for applications requiring higher strength. | Use the applicable alloy and temper specification stated in the project drawings or purchase specification. | Material certificates identifying alloy and temper, plus traceability linking the material to the production batch. | Alloy and temper affect mechanical properties, extrudability, corrosion behaviour, and suitability for finishing. |
| Dimensional capability | Check whether the supplier can meet the drawing’s dimensions, wall thicknesses, straightness, twist, and cut-length requirements. | EN 755-9 covers dimensional and form tolerances for extruded rods, bars, tubes, and profiles. Confirm the applicable standard and tolerance class with the supplier. | Inspection reports for a representative profile, measuring methods, and written confirmation of tolerance requirements before tooling approval. | Extrusion tolerances depend on profile geometry, dimensions, alloy, and the agreed specification; a drawing-specific review is essential. |
| Building-profile compliance | For building applications in China, confirm which product requirements apply to the profile and its surface treatment. | GB/T 5237 is the Chinese standard series for aluminium alloy profiles for building. Its parts address topics including base profiles and surface treatments. | Test or inspection documents identifying the relevant GB/T 5237 part and the product requirements covered. | Applicable requirements depend on the product type and finish; the standard reference should match the project specification. |
| Surface finish | Specify the finish, colour, appearance limits, coating or anodic-film requirements, and inspection method. Clarify how visible faces and edges are assessed. | ISO 7599 provides a specification method for decorative and protective anodic oxidation coatings on aluminium. | Finish samples, agreed colour or appearance criteria, coating inspection results, and records of the finishing process. | Finish performance and appearance depend on the specified process, substrate, inspection conditions, and service environment. |
| Quality management | Check that production controls cover incoming material, extrusion, finishing, inspection, nonconformities, and corrective actions. | ISO 9001:2015 specifies requirements for a quality management system. | A current certificate with a scope relevant to the manufacturing site and products, and an explanation of in-process quality controls. | A management-system certificate is useful evidence of process controls, but it does not by itself prove that a particular profile meets its specification. |
| Testing and traceability | Agree on the inspection plan, sampling frequency, test methods, acceptance criteria, and batch identification before production. | Use the project specification and the applicable product or test standards to define acceptance criteria. | Sample inspection reports, material and batch records, nonconformance procedures, and final inspection documentation. | Documented traceability helps connect test results and corrective actions to the supplied production batch. |
| Tooling and design support | Ask for a review of profile geometry, wall-thickness variation, hollow sections, die feasibility, and proposed revisions before tooling begins. | Use the approved profile drawing and written design-change controls as the reference for manufacture. | Design-for-extrusion feedback, tooling approval records, and a controlled process for sample review and drawing revisions. | Early engineering review can identify manufacturability issues before they affect tooling, quality, or delivery. |
| Production planning and delivery | Confirm actual capacity for the required profile, order quantity, finish, packaging, and delivery schedule rather than relying on a general capacity claim. | Set project-specific delivery milestones and acceptance requirements in the purchase agreement. | A production schedule, stated lead-time assumptions, packaging specification, and agreed procedures for delays or schedule changes. | Lead time can vary with tooling, alloy, order volume, finishing, inspection, and shipping arrangements. |
| Environmental and export requirements | Identify destination-market rules, documentation needs, packaging requirements, and any project-specific environmental criteria. | ISO 14001:2015 specifies requirements for an environmental management system; it is not a product-performance standard. | Relevant site documentation, export and product documents required by the destination market, and confirmation of packaging details. | Management-system certification and market-specific product compliance address different requirements and should be checked separately. |