| Application and Compressor Type | Select an oil-injected twin screw compressor for general factory air and an oil-free design where process air must meet strict contamination limits. | Confirm the required air purity, duty cycle, ambient conditions, permissible oil content, and whether the application is general industrial, food processing, pharmaceutical, electronics, or instrumentation. | 10% | __/10 |
| Rated Air Delivery | Require performance data at the actual operating pressure. Common industrial packages cover approximately 1.5–50 m³/min, depending on motor size and configuration. | Request a certified performance table showing free air delivery, inlet conditions, discharge pressure, rated speed, and measurement tolerance. Avoid comparing flow figures measured at different conditions. | 12% | __/10 |
| Working Pressure | Typical factory-air requirements are commonly within 7–13 bar(g). Higher-pressure models should be selected only when the process requires them. | Check minimum and maximum working pressure, pressure regulation range, pressure dew point requirements, and whether the quoted flow is maintained at the specified pressure. | 8% | __/10 |
| Motor Power and Electrical Compatibility | Industrial twin screw packages commonly range from approximately 18.5 kW to 315 kW. The motor voltage, frequency, phase, and starting method must match the installation. | Verify motor efficiency class, rated current, insulation class, protection rating, voltage and frequency options, control-panel compliance, and suitability for the local electrical grid. | 8% | __/10 |
| Energy Efficiency | Prefer variable-speed control where demand fluctuates. Compare specific power in kW/(m³/min) at the same pressure and operating conditions rather than comparing motor power alone. | Request full-load and part-load power curves, specific-power test data, unload power consumption, control logic, and estimated annual energy cost based on the site's actual load profile. | 15% | __/10 |
| Airend and Rotor Design | The airend should be designed for continuous-duty operation, stable oil separation, low vibration, and reliable operation at the specified pressure range. | Ask for airend model information, rotor speed, bearing arrangement, lubrication method, design life, balancing method, and the availability of replacement airend or overhaul parts. | 10% | __/10 |
| Cooling System and Ambient Conditions | Select air-cooled or water-cooled construction according to site conditions. The package should state its maximum ambient temperature, commonly around 40–45°C for standard industrial configurations. | Confirm cooling capacity, required cooling-water quality if applicable, ventilation requirements, high-temperature protection, and performance derating at the installation site's maximum temperature. | 6% | __/10 |
| Noise and Vibration | Prefer a package with an enclosed acoustic design, anti-vibration mounts, and a declared sound-pressure level measured under a defined test condition. | Request the sound-pressure measurement method, test distance, operating pressure, enclosure specification, vibration limits, and installation recommendations for foundations and pipework. | 5% | __/10 |
| Filtration and Oil Separation | Oil-injected models should include an oil filter, air-oil separator, oil cooler, thermostatic control, and effective condensate management. | Confirm separator residual-oil performance, filter service intervals, replacement-element part numbers, separator pressure drop, oil type, oil-fill volume, and compatibility with food-grade or synthetic lubricants where required. | 7% | __/10 |
| Controller and Remote Monitoring | The controller should provide pressure control, temperature protection, maintenance reminders, fault history, load/unload status, and operating-hour records. | Verify display language, password levels, alarm history, emergency-stop function, remote start/stop permissions, Modbus or other communication interfaces, and compatibility with plant-management systems. | 5% | __/10 |
| Factory Testing and Documentation | Each package should be inspected and tested before shipment, with traceable serial-number documentation and operating manuals in English. | Request the inspection checklist, test report, wiring diagram, pressure-vessel documents where applicable, spare-parts list, installation manual, maintenance schedule, and recommended commissioning procedure. | 6% | __/10 |
| Quality Management and Compliance | A documented quality-management system such as ISO 9001 is a useful baseline. Market-specific compliance may include CE requirements or other applicable electrical and pressure-equipment standards. | Verify certificate validity, certification scope, product conformity documents, electrical safety reports, pressure-component records, and whether the documents apply to the quoted production facility and model. | 5% | __/10 |
| Spare Parts and Service Support | Critical consumables should be available for the expected service period. A practical maintenance plan normally includes oil, filters, separator elements, belts or couplings, seals, sensors, and valves. | Request a two-year spare-parts list, pricing, stock location, estimated delivery time, service network coverage, remote troubleshooting process, and technician training availability. | 5% | __/10 |
| Warranty and After-Sales Terms | A written warranty of approximately 12–24 months is commonly requested for industrial equipment, subject to installation, operating conditions, and maintenance compliance. | Check warranty start date, covered components, exclusions, response time, labor and freight responsibility, commissioning requirements, and the procedure for handling performance or quality claims. | 5% | __/10 |
| Total Cost of Ownership | Evaluate purchase price together with electricity, lubricant, filters, planned maintenance, downtime risk, installation, freight, customs, and end-of-life costs. | Build a five-year cost model using actual annual operating hours, electricity price, load profile, maintenance intervals, spare-parts prices, and expected service requirements. | 8% | __/10 |
| Supplier Communication and Export Capability | Select a supplier that provides consistent technical answers, clear commercial terms, export documentation, secure packaging, and a defined project schedule. | Assess response quality, quotation completeness, technical-English capability, Incoterms, payment terms, packaging method, shipping documents, reference installations without relying only on marketing claims, and project-management discipline. | 6% | __/10 |