| 1 | Mounting configuration | Confirm the required mounting arrangement, shaft orientation, terminal-box position, and installation clearances before requesting a quotation. | Use the applicable IEC 60034-7 mounting-arrangement classification as a reference; confirm the exact configuration on the drawing. | Dimensioned outline drawing, mounting code, and written confirmation of terminal-box position. |
| 2 | Electrical ratings | Specify rated output, voltage, frequency, phase, current, duty, insulation class, and any starting or speed-control requirements. | Ratings and performance should be stated clearly on the datasheet and nameplate. Confirm compatibility with the destination-country supply. | Technical datasheet, nameplate sample, wiring diagram, and any required efficiency declaration. |
| 3 | Routine testing | Ask which routine tests are performed on each motor and whether test results are traceable to the motor serial number. | IEC 60034-1 covers rating and performance requirements; IEC 60034-2-1 describes methods for determining losses and efficiency. | Sample routine-test report showing the tested parameters, acceptance criteria, and serial-number traceability. |
| 4 | Ingress protection | Match the enclosure protection to the actual environment, including dust, water exposure, cleaning practices, and outdoor installation. | IP classification is covered by IEC 60034-5. The required IP rating depends on the application and should be specified in the purchase contract. | Declared IP rating, product documentation, and relevant verification or test records. |
| 5 | MOQ and sample orders | Ask whether the minimum order quantity differs for standard products, customized mounting, special voltage, or non-standard materials. | There is no universal MOQ for mount motors. Request separate quantities and pricing for samples, pilot orders, and repeat production. | Written quotation stating MOQ by configuration, sample charge, tooling charge, and any mixed-model order conditions. |
| 6 | Production lead time | Confirm the production schedule, material availability, inspection time, and the point at which the delivery clock starts. | Lead times are supplier- and order-specific; distinguish production time from shipping and customs transit time. | Order schedule with estimated production completion, inspection date, dispatch date, and delay-notification terms. |
| 7 | Warranty coverage | Define the warranty start date, coverage period, covered failures, exclusions, remedy, and responsibility for return freight. | Warranty terms vary by supplier and contract. Avoid relying on a verbal promise; make the agreed terms part of the purchase order. | Written warranty document covering claims procedure, repair or replacement options, and required supporting evidence. |
| 8 | Quality control and traceability | Check how incoming materials, production stages, final inspection, and non-conforming products are controlled. | Request the supplier’s current quality-system documentation and clarify whether inspection records are retained by serial number or batch. | Quality certificate where applicable, inspection checklist, sample records, and corrective-action process. |
| 9 | Packaging and export readiness | Confirm protection against moisture, impact, corrosion, and movement during transport, as well as destination marking requirements. | Packaging should suit the transport mode, route, storage conditions, and destination regulations; specify these requirements before production. | Packaging specification, carton or crate dimensions, gross weight, shipping marks, and packing-list sample. |
| 10 | Commercial and delivery terms | Compare quotation validity, payment milestones, currency, delivery terms, spare parts, and responsibility for export documents. | State the agreed Incoterms® rule and named place in the contract. Confirm that the quotation identifies what is included and excluded. | Formal quotation, pro forma invoice, agreed Incoterms® rule and place, and list of export documents supplied. |
| Buyer note: This is an anonymized procurement checklist, not a verified ranking or a set of manufacturer-specific claims. MOQ, lead time, test scope, and warranty must be confirmed in writing for each product and order. |