| Electrical safety | Product certification, grounding, enclosure condition, and installation instructions | Choose a PDU certified or listed for the destination market and intended use. Confirm protective earth continuity and follow the manufacturer’s installation and mounting instructions. | Appropriate certification and correct installation help reduce risks of electric shock, overheating, and fire. |
| Input voltage and phase | Supply voltage, number of phases, and the facility’s available circuit | Match the PDU input to the actual supply—for example, a single-phase or three-phase feed at the site’s nominal voltage. Do not assume that a PDU can accept a different voltage or phase. | A mismatch can prevent operation or create an unsafe electrical condition. |
| Input plug and outlet type | Input connector, outlet connector, outlet count, and connector ratings | Compare the PDU’s input plug with the receptacle and branch circuit. Match outlet types to equipment plugs; common IEC 60320 connections include C13/C14 and C19/C20, which have different current ratings. | Physical fit alone does not confirm that a connector or circuit is suitable for the load. |
| Current and circuit capacity | PDU input rating, branch-circuit rating, breaker limits, and expected load | Check the ratings on the PDU, circuit, and equipment documentation. Calculate the anticipated load using the applicable electrical rules and do not exceed the lowest relevant rating. | Overloading can trip protection devices and may lead to overheating or service interruption. |
| Overcurrent protection | Whether the PDU has branch-level or outlet-level protection, and how it is rated | Confirm the type and rating of any breakers or fuses, and whether protection is provided for the circuits or outlets that need it. A PDU’s protection does not replace correctly sized upstream protection. | Protection must suit the connected load and the electrical installation. |
| Rack fit and mounting | Rack width, available mounting space, PDU length, orientation, and clearance | Verify compatibility with the rack’s mounting system and check that the PDU will not obstruct equipment, airflow, doors, or cable routing. Confirm the required rack units or vertical mounting space. | A suitable physical fit supports safe installation and keeps service access and airflow clear. |
| Outlet layout and cable reach | Outlet orientation, spacing, cord length, and plug clearance | Map the PDU outlets against server power-supply locations and cord lengths. Allow room for larger plugs and avoid layouts that block adjacent outlets. | Good outlet placement reduces cable strain, blocked sockets, and installation difficulty. |
| Monitoring and control | Basic, metered, monitored, or switched functionality | Select basic distribution for simple power delivery; consider metering for local load visibility, network monitoring for remote reporting, or switched outlets when remote power cycling is required. Confirm the supported management and security features. | The required feature level depends on operational visibility and remote-management needs. |
| Environmental suitability | Operating temperature, humidity limits, and any enclosure or ingress rating | Compare the PDU’s stated environmental limits with the rack location. If dust or moisture exposure is possible, verify that the product’s stated protection rating is appropriate for that environment. | Environmental conditions can affect reliability and product safety. |
| Redundancy and load distribution | Availability of independent power feeds and the load on each feed | For equipment with dual power supplies, connect each supply to a separate, appropriately rated power path where the facility design supports it. Check that either path can support its assigned load under the planned failure scenario. | Separate feeds can improve resilience, but only when the upstream power paths are genuinely independent and adequately sized. |
| Future expansion | Expected device growth, outlet demand, circuit capacity, and monitoring needs | Estimate the future connected load and outlet count before purchase. A planning allowance such as 20–30% spare capacity may be useful, but it is a planning target—not a substitute for applicable electrical limits or a load assessment. | Planning ahead can avoid premature replacement while keeping the installation within rated limits. |