| Conveyor type and application | Confirm whether the duty calls for a belt, roller, chain, or other conveyor, based on the load, route, environment, and required transfers. | Layout drawing; product dimensions and weight range; operating sequence; ambient conditions. | The proposed design covers the full product range, incline or decline, transfer points, and access needed for operation and maintenance. |
| Capacity and operating conditions | Specify required throughput, operating hours, loading pattern, conveyor speed, and peak as well as normal demand. | Capacity calculations using the stated product rate, spacing, conveyor speed, and operating schedule. | Calculations state their assumptions and show that the design meets the required rate without relying on unconfirmed future capacity. |
| Dimensions and interfaces | Verify conveyor length, belt or roller width, elevation, transfer height, support locations, and connections to adjacent equipment. | Dimensioned general-arrangement drawing; site measurements; interface and utility schedule. | Drawing dimensions match the site and equipment interfaces; maintenance and emergency access are not obstructed. |
| Purchase and installation cost | Compare the complete installed scope, not only the conveyor equipment price. | Itemized quotation covering equipment, controls, guarding, supports, freight, installation, commissioning, training, taxes, and exclusions. | Each supplier prices the same scope, quantities, site assumptions, and delivery terms; exclusions and change-order rates are identified. |
| Ownership cost | Estimate energy, inspection, routine maintenance, wear parts, downtime, and expected replacement work over the selected evaluation period. | Motor power and operating schedule; energy-use estimate; maintenance schedule; parts list; warranty terms; downtime assumptions. | Compare alternatives using the same operating hours, energy price, evaluation period, and cost assumptions. Request the calculation method rather than relying on an unsupported savings claim. |
| Risk assessment and guarding | Check hazards at nip points, drive components, transfers, access points, and areas where people may reach or pass near moving parts. | ISO 12100:2010 provides principles for machinery risk assessment and risk reduction. In the United States, OSHA 29 CFR 1910.212 sets general machine-guarding requirements. | Obtain the risk assessment and guarding layout. Verify that guards, access controls, and safe maintenance procedures address the hazards identified for the actual installation. |
| Safety-related control systems | Confirm the required safety functions, such as guarded-access stopping, and the design level established by the risk assessment. | ISO 13849-1:2023 covers design principles for safety-related parts of control systems; the required performance level depends on the risk assessment. | Request the safety-function specification and supporting validation documentation. Do not assume a particular performance level applies to every conveyor. |
| Electrical equipment | Review electrical design, isolation provisions, control-panel details, wiring documentation, and site supply requirements. | IEC 60204-1:2016, including Amendment 1:2021, addresses electrical equipment of machines. Confirm the applicable edition and local requirements for the installation. | Drawings and equipment documentation identify supply, protection, isolation, and control details; installation acceptance follows the applicable jurisdictional rules. |
| Emergency stop | Verify emergency-stop device locations, accessibility, circuit design, reset behavior, and how the conveyor responds when activated. | ISO 13850:2015 provides principles for the emergency-stop function of machinery. Applicable legal and site requirements must also be checked. | Review the safety design and test the emergency-stop function during commissioning. Resetting the device must not itself restart the conveyor. |
| Applicable standards and jurisdiction | Identify the country of installation and distinguish legal requirements from voluntary engineering standards or contractual specifications. | Written compliance matrix listing each applicable regulation, standard and edition, responsible party, and required evidence. | The purchaser and supplier agree in writing on the applicable requirements before design approval; a standards reference alone is not proof of conformity. |
| Commissioning and acceptance | Define inspections and functional tests for capacity, controls, safety devices, noise or other project-specific requirements. | Commissioning plan; test records; agreed acceptance criteria; outstanding-items list. | Acceptance criteria are measurable and agreed before purchase. Test results and corrective actions are documented before final handover. |
| Spare parts and maintenance | Check which wear parts are used, how they are identified, expected maintenance tasks, and the availability of manuals and replacement parts. | Recommended spare-parts list; maintenance instructions; parts identification; stated availability and lead-time commitments. | Critical parts can be identified and ordered from the documentation; maintenance tasks, intervals, and required skills are stated. |
| Long-term technical support | Clarify support hours, response targets, service coverage, software or controls support, warranty exclusions, and escalation arrangements. | Written support agreement with service scope, contact method, response-time targets, warranty period, and parts-support terms. | Commitments are contractual and suited to the site’s operating schedule. Treat response times and parts availability as supplier commitments, not universal industry guarantees. |