| Charger type | 22 kW AC charging | AC charging power is limited by the vehicle’s onboard AC charger, as well as the available electrical supply. |
| Ideal calculation for a 60 kWh battery | 60 kWh ÷ 22 kW ≈ 2.7 hours | This is a theoretical estimate before charging losses and assumes the vehicle can accept 22 kW AC continuously. |
| Estimated time including charging losses | About 2.9–3.0 hours at 90–95% charging efficiency | Actual time can vary with temperature, battery condition, vehicle settings, and charging power changes. |
| Vehicle’s onboard AC charging limit | If limited to 11 kW: approximately 5.5 hours ideally, or about 5.7–6.1 hours with losses | A 22 kW charger cannot make a vehicle charge faster than its onboard AC charging limit. |
| Electrical supply | 22 kW AC commonly requires a suitable three-phase supply; around 400 V and 32 A per phase is a typical reference point | Supply voltage, current capacity, installation conditions, and local electrical rules must be checked by a qualified installer. |
| Single-phase supply comparison | At 230 V and 32 A, theoretical power is about 7.4 kW | A 22 kW-rated unit will not deliver 22 kW if the supply or vehicle supports less. |
| Daily charging requirement | For example, 30 kWh added at 22 kW takes about 1.4 hours ideally | Choose charging capacity based on typical daily energy use, parking time, and the vehicle’s charging capability. |
| Installation and safety | Confirm circuit capacity, protective devices, cable routing, and applicable local requirements | A qualified electrician should assess the site and verify that the installation is suitable for the selected charger. |
| Estimate limitation | Times assume a 60 kWh energy amount and steady charging; actual results may be longer | Battery usable capacity, starting charge level, vehicle power limits, thermal conditions, and charging behavior affect real-world time. |