| Product and assembly scope | Specify whether you need PCB assembly only or a broader service that includes PCB fabrication, component sourcing, programming, enclosure assembly, or final testing. | Turnkey assembly with component procurement and board-level testing. | Which operations are performed in-house, which are subcontracted, and who manages the handoffs? |
| Production stage and volume | Identify prototype, engineering validation, pilot, or repeat production; provide expected order quantity and annual demand. | Prototype lot of 10–50 boards, followed by a pilot lot and forecasted monthly releases. | Can the provider support the required lot sizes, production changes, and capacity ramp without compromising traceability? |
| Board and panel specifications | Document board dimensions, layer count, thickness, panelization, surface finish, and any unusual materials or design constraints. | Four-layer FR-4 board, approximately 1.6 mm thick; panel details supplied in the fabrication data. | Are the board dimensions, panel design, fiducials, tooling holes, and solder-mask details compatible with the assembly process? |
| Component and package mix | List package types, smallest components, fine-pitch devices, through-hole parts, connectors, and any parts requiring special handling. | Mixed assembly with common chip components, fine-pitch ICs, and a small number of through-hole connectors. | What package and pitch limits can the process reliably support, and what placement or inspection evidence is available? |
| Assembly technology | State whether the design uses surface-mount technology (SMT), through-hole technology (THT), or a combination, and identify both board sides requiring assembly. | Double-sided SMT with selective through-hole soldering on one side. | Can the provider support the required reflow, wave, selective, or hand-soldering operations and sequence? |
| Bill of materials and sourcing | Provide part numbers, manufacturer part numbers where applicable, quantities, approved alternatives, lifecycle constraints, and customer-supplied parts. | Complete BOM with approved alternates identified; critical parts require prior approval before substitution. | How are component authenticity, lot traceability, shortages, substitutions, and obsolete or long-lead-time parts managed? |
| Quality and acceptance criteria | Define workmanship requirements, inspection criteria, defect handling, and any product-specific acceptance requirements. | Acceptance criteria documented before production; workmanship assessed against the agreed standard and product class. | Which workmanship standard and revision will apply, and how are nonconformances, rework, and customer approvals documented? |
| Inspection and testing | Choose the required inspection and test methods, such as automated optical inspection (AOI), X-ray inspection, in-circuit testing, or functional testing. | AOI for assembled boards, X-ray for selected hidden solder joints, and a customer-provided functional test procedure. | Which tests are available, what test fixtures or programs are needed, and what reports or test records will be delivered? |
| Process controls and traceability | Define the level of material, process, and finished-board traceability needed, including serial numbers and record-retention expectations. | Lot-level component and production records, with serial-number tracking for finished boards. | Can production records link materials, process history, inspection results, and rework to each lot or serial number? |
| Special handling and environment | Identify moisture-sensitive devices, electrostatic-discharge precautions, cleanliness needs, conformal coating, or other handling requirements. | Moisture-sensitive components handled according to their labeling and applicable handling procedures; ESD controls required. | What storage, floor-life, bake, ESD, cleaning, coating, and environmental controls are available and documented? |
| Schedule and logistics | Provide target dates, delivery location, shipping method, packaging needs, and whether production will be released in multiple batches. | Prototype delivery requested by a defined date, with repeat orders released in scheduled lots. | What is the quoted lead time, what assumptions affect it, and how are schedule changes or material delays communicated? |
| Engineering data and change control | Prepare the Gerber or ODB++ data, BOM, assembly drawings, pick-and-place files, test instructions, and revision information. | All files carry matching revision identifiers; changes are issued through a documented approval process. | Which file formats are accepted, how are discrepancies resolved, and how are revisions controlled between builds? |
| Commercial and service expectations | Clarify quotation scope, tooling or setup charges, minimum order quantities, warranty terms, payment terms, and post-delivery support. | Itemized quotation covering setup, assembly, sourcing, inspection, testing, and shipping as separate scope items where applicable. | Are exclusions, one-time charges, rework terms, warranty coverage, and support responsibilities stated in writing? |