| 01 | Supplier Profile A | 12–60 MW | Extraction-condensing steam turbine | 4.0–6.5 MPa | 400–485°C | 24–29% | Three-phase synchronous generator; air-cooled | 92–96% | PLC/DCS integration; online vibration and bearing-temperature monitoring | Strong domestic field-service coverage; remote commissioning available | 14–20 months | Balanced technology and service |
| 02 | Supplier Profile B | 6–35 MW | Condensing turbine with optional extraction stage | 3.8–6.0 MPa | 395–480°C | 23–28% | Brushless excitation; enclosed air-to-water cooling options | 91–95% | Digital governor, emergency overspeed protection and DCS interface | Good retrofit support and spare-parts availability | 12–18 months | Strong value for medium plants |
| 03 | Supplier Profile C | 20–100 MW | High-capacity extraction-condensing turbine | 5.3–9.0 MPa | 450–520°C | 26–32% | High-efficiency synchronous generator; hydrogen or water cooling options | 93–97% | Redundant control architecture; turbine condition monitoring | Comprehensive EPC coordination and lifecycle service | 18–26 months | Best suited to large-scale projects |
| 04 | Supplier Profile D | 5–25 MW | Back-pressure or small condensing turbine | 3.0–5.0 MPa | 380–450°C | 21–26% | Air-cooled synchronous generator | 90–94% | PLC-based control with standard protection package | Practical local maintenance support; limited overseas personnel | 10–16 months | Cost-effective for smaller facilities |
| 05 | Supplier Profile E | 10–50 MW | Extraction-condensing turbine for combined heat and power | 4.5–7.5 MPa | 420–500°C | 24–30% | Synchronous generator with flexible power-factor control | 92–96% | Load-following control; heat and power dispatch integration | Good CHP application engineering and performance optimization | 14–22 months | Strong CHP and district-heating fit |
| 06 | Supplier Profile F | 8–40 MW | Condensing turbine with adjustable extraction | 4.0–6.8 MPa | 400–490°C | 23–29% | Brushless synchronous generator; high-efficiency cooling system | 91–95% | Integrated turbine protection, PLC control and SCADA connectivity | Responsive commissioning support; standard spare-parts packages | 12–20 months | Reliable general-purpose option |
| 07 | Supplier Profile G | 15–80 MW | High-pressure condensing or extraction-condensing turbine | 5.0–8.5 MPa | 440–515°C | 25–31% | Large-frame synchronous generator; water-cooled options | 92–97% | Redundant speed control and advanced vibration diagnostics | Strong engineering resources; structured overhaul programs | 18–24 months | High performance for demanding duty cycles |
| 08 | Supplier Profile H | 3–20 MW | Compact condensing turbine | 2.5–4.5 MPa | 360–430°C | 19–24% | Compact air-cooled synchronous generator | 89–93% | Standard PLC controls; basic remote data access | Simple maintenance model with short domestic response times | 9–15 months | Suitable for small and modular WTE units |
| 09 | Supplier Profile I | 25–120 MW | Large extraction-condensing turbine | 6.0–10.0 MPa | 460–540°C | 27–33% | High-capacity synchronous generator; hydrogen-cooled configurations | 93–98% | Plant-wide DCS integration; predictive maintenance capability | Comprehensive technical documentation and long-term service options | 20–30 months | Premium performance for large plants |
| 10 | Supplier Profile J | 7–45 MW | Extraction-condensing turbine with flexible exhaust pressure | 3.5–6.5 MPa | 390–475°C | 22–28% | Synchronous generator; air-cooled standard configuration | 90–95% | PLC/DCS compatibility; automatic synchronization and protection | Competitive domestic service and customization support | 12–19 months | Flexible option for customized projects |